The former rail line ... and resurface part of the route and install fencing. Some work has already been carried out, including cutting away brambles which had made some of the track inaccessible.
A coastal path could have rest areas created on the sites of old railway features as part of a £2.9m upgrade inspired by its heritage. The Cinder Track was the main line between Scarborough and ...