Unit 1 and unit 2 of Barakah nuclear power plant APR-1400 reactors in the United Arab Emirates. The APR-1400 (for Advanced Power Reactor 1400 MW electricity) is an advanced pressurized water nuclear reactor designed by the Korea Electric Power Corporation (KEPCO). Originally known as the Korean Next Generation Reactor (KNGR), [1] this Generation III reactor was developed from the earlier OPR ...
我所认识的核电(2)——压水堆补充简介 - 知乎
在应对熔堆事故方面,apr1400也是熔融物堆内滞留(ivr)技术的支持者。 apr1400的安全壳和大多数的第二代压水堆一样,为单层的钢衬里+钢筋混凝土结构。 图2-64:脱胎于system80+的韩国apr1400堆型的一回路(只是个视频截图,不太准确,请自动忽略没有稳压器这个bug)
APR1400 Design Control Document and Environmental Report
The applicant's design control document (DCD) provides information to support the NRC's approval and certification of the standard APR1400 design, under the provisions of Title 10, Part 52, of the Code of Federal Regulations (10 CFR Part 52), "Licenses, Certifications, and Approvals for Nuclear Power Plants." The DCD is divided into two parts ...
韩国下一代反应堆—APR 1400 - caea.gov.cn
2005年11月29日 · 1、APR1400的设计寿命是60年,比现存40年延长了50%。 2、APR1400的厂址设计条件对抗震要求从现存的0.2g提升到0.3g,提高了50%。而且安全壳与辅助厂房都布置在单一共同基垫上,进一步提高了抗震能力。
What is the APR1400 Reactor? | KEPCO - 한국전력공사
The APR1400 currently being marketed for export by KEPCO has had added to its design significant enhancements in regard to safety as well as increased power capabilities. Based upon the predecessor OPR1000 reactor and Korea’s experience gained over the country’s non-stop development of nuclear reactors, the upgraded APR1400 has been ...
APR1400 | NRC.gov
2025年2月25日 · Application for Standard Design Certification for the Advanced Power Reactor 1400 (APR1400), a 4,000-MWt pressurized-water reactor (PWR) When: KEPCO and KHNP submitted the Standard Design Certification Application on December 23, 2014. The staff of the U.S. Nuclear Regulatory Commission (NRC) is currently performing a detailed review of that ...
during 10 years and obtained design certification at May, 2002. Currently, the first commercial APR1400 nuclear power plants, Shin-Kori 3&4 project for constructing are in progress. Shin-Kori 3&4 will be completed at mid 2013. 1. INTRODUCTION The APR1400 is an evolutionary ALWR for which the design is based on the current KSNP design with
APR1400 Final Safety Evaluations | NRC.gov
2018年9月28日 · APR1400 Final Safety Evaluations. The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of the DCD application that Korea Electric Power Corporation (KEPCO) and Korea Hydro & Nuclear Power Co., Ltd. (KHNP) submitted for the Advanced Power Reactor 1400 (APR1400):
apr1400的10倍,经济性比其高出10%,施工周期进一步缩短 到36个月。 2apr1400的概况 apr1400电厂的发电模块包括核岛(ni)和汽轮机岛(ti) 两部分,ni包括反应堆厂房、辅助厂房和共用厂房。ti包括汽 轮机厂房和开关设备的建设,其主要性能特点:
Nuclear heat storage and recovery for the APR1400
2020年4月1日 · The APR1400 reactor power cycle provides a convenient starting point for evaluation of the NHS&R System design. The APR1400 is a relatively new design with improved construction and safety improvements with power cycle operation temperatures and pressures similar to other LWR plants globally. In addition, the APR1400 design has been employed by ...