EPC 和工程总承包有什么区别? - 知乎
EPC(Engineering Procurement Construction)是指公司受业主委托,按照合同约定对工程建设项目的设计、采购、施工、试运行等实行全过程或若干阶段的承包。 通常公司在总价合同条件下,对所承包工程的质量、安全、费用和进度负责。
EPC vs EPCM – What is the difference? - Construction Front
Even though they have similar names, EPC and EPCM agreements are vastly different from a commercial and risk allocation perspective – whilst in the former framework, the EPC contractor typically assumes the majority of construction risks, in the latter model, the EPCM contractor is usually hider under a professional services contract, acting ...
建设工程EPC模式与EPCM模式的比较分析 - 知乎
在EPC模式下,无论是设备还是施工的供方,一般均由EPC承包人自主确定;而在EPCM模式下,设备和施工的供方由业主与EPCM承包人共同协商确定,有时EPCM承包人也会向业主供应必要的材料或设备或承担设计工作。
EPC/EP+C/E+PC/E+P+C之间的区别是什么? - 百度知道
ep+c是指设计和采购作为一体承包,施工另外承包,这样给业主(招标单位)带来工程管理上的难度。 e+p+c则是设计、采购和施工分别招标,三个环节完全分开,这样给业主(招标单位)带来工程管理上的难度最大,要协调管理三方便的工作,要自行管理从设计 ...
工程中EPC、EP+C、E+P+C是什么意思啊,有何区别?_百度知道
区别在于含义以及范围不同: EPC是英文:Engineer,Procure,Construct头字母缩写。 其中文含义是对一个工程负责进行“设计、采购、施工”,与通常所说的工程总承包含义相似。
Key Differences Between EPC and EPCM Project Execution Models
2022年4月29日 · Enhancing construction of process plant solutions and components is the critical aim of both EPC and EPCM execution models. But how are these two models different? Each of these models is carried...
EPC和EP有什么区别? - 百度知道
2024年11月30日 · 总的来说,EPC和EP的主要区别在于工程承包的范围和责任划分。 EPC模式涵盖了设计、采购和施工的全部责任,由一家承包商全程负责;而EP模式则将设计和采购合并由一个承包商负责,施工由另一个承包商承担。
EPC vs EPCM Contracts: Understanding the Key Differences II 5 …
EPC contracts offer a turnkey solution with a single point of contact, while EPCM contracts provide greater flexibility and owner involvement. By understanding the key differences between these two contract types, project stakeholders can make informed decisions that align with their project’s goals and requirements.
EPCM vs EPC: Key Differences Explained - mastt.com
2025年1月27日 · Learn the key differences between EPCM and EPC contracts, including how they handle risk, costs, and control, to choose the best fit for your project.
EPC or EPCM contracts? - Hogan Lovells
The fundamental difference is the role of the EPC or EPCM contractor. In an EPC contract, the EPC contractor develops the project from commencement to final completion.