
Nam Lik 1 – EDL-GENERATION PUBLIC COMPANY
nam beng hpp NAMLONG 1 HPP EDL-GEN was established on 15 December 2010 and it was the first public company that registered in the Lao Securities Exchange (LSX).
Power plant profile: Nam Lik 1, Laos - Power Technology
2024年10月21日 · Nam Lik 1 is a 64.5MW hydro power project. It is located on Nam Lik river/basin in Vientiane, Laos. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active.
Nam Lik 1 - Andritz
The electricity, generated by HPP Nam Lik 1, will be supplied directly into the national grid for domestic use. It will make an important contribution to the security of electricity supply and opens up the future potential to boost economic growth in Vientiane province.
Nam Lik 1-2 HPP – ບໍລິສັດ ຜະລິດ – ໄຟຟ້າລາວ ມະຫາຊົນ
ຊື່ໂຄງການ: ບໍລິສັດ ໄຟຟ້ານ້ຳລີກ 1-2 ຈຳກັດ: ຜູ້ຖືຮຸ້ນ: cwe 90% edl-gen 10%
Nam Lik 1-2 hydroelectric plant - Global Energy Monitor
2024年3月21日 · Nam Lik 1-2 hydroelectric plant is an operating hydroelectric power plant in Feuang District, Vientiane Province, Laos.
The Nam Lik 1-2 Hydropower Project is a diversion type hydropower project. The total install capacity of the project is 100 MW. The construction of the project includes concrete faced rock-fill dam, auxiliary dam, over-year regulation reservoir, spillway tunnel, flood discharge tunnel, diversion system, power house and transmission system.
南立1-2水电站: 中资企业进入老挝水电市场的样板
2017年11月20日 · 南立1-2水电站(下称“南立电站”)总投资额14914万美元,装机容量100MW,装机台数2台,单机容量50MW,设计多年平均发电量4.35亿千瓦时,商业运营期限为25年。 该项目于2007年9月1日正式开工,并于2010年8月1日正式投入商业运营,投产以来一直保持安全稳定运行。 “南立电站的库容非常大,超过13亿立方米,这在老挝电站中屈指可数。 南立电站水库具备多年调节能力,所以在某种程度上而言,南立电站在老挝目前以水力发电为主的电 …
CDM: Nam Lik 1 Hydropower Project - UNFCCC
Appendix 1 - IRR spreadsheet_Nam Lik1 HPP_2014-07-21 (643 KB) Appendix 2 - Emissions Reductions_Nam Lik1 HPP_2014-07-21 (4135 KB) - registration request form (102 KB) SDC description report Not Available. Please refer to our Further …
Better Hydro: Asset reliability and efficiency at Nam Lik
Rigorous monitoring of equipment performance, together with an effective maintenance routine, has enabled the Nam Lik 1-2 project to exceed the terms of its power purchase agreement and generation target every year since commissioning. The project demonstrates excellence in asset reliability and maintenance.
Nam Lik 1 Hydropower dam project – fmlao
Nam Lik1 hydropower project is main contractor by POSCO; FM constructed on road drainage, culvert installation, concrete access road and cofferdam concrete slop protection (0.50m of thickness with 4,200 m3 of concrete).
- 某些结果已被删除