
North Spokane Corridor | WSDOT - Washington State …
The North Spokane Corridor (NSC) is a 10.5-mile multi-modal corridor. When complete, the NSC will be a 60-mile per hour, north/south limited access facility that connects I-90 at the south (just west of the existing Thor/Freya interchange) and connects to US 2 (at Farwell Road) and US 395 (at Wandermere) on the north end.
North Spokane Corridor - Wikipedia
The U.S. Route 395 North Spokane Corridor (NSC) is a 10.5-mile-long (16.9 km) freeway—with 7 miles (11 km) complete and currently operational—running north–south along the eastern border of Spokane, Washington and parts of unincorporated Spokane County to the north.
US 395 – NSC I-90 Connection | WSDOT
The construction of the North Spokane Corridor connection to I-90 will be broken into four projects, with the first anticipated to begin in either late 2025 or spring of 2026. Completion is expected in 2030 as the final link and connection for the North Spokane Corridor.
North Spokane Corridor QUICK FACTS BACKGROUND •he North Spokane Corridor (NSC) is a T 10.5 mile limited access corridor, linking I-90 on the south, to existing US 2 and US 395 on the north. The NSC improves overall mobility by allowing motorists and freight to move north and south through metropolitan Spokane.
Getting There: Finally fully funded, North Spokane Corridor on …
2024年4月15日 · The final push in constructing the long -anticipated North Spokane Corridor is underway, and developers say the 10.5-mile highway is entirely funded and on track to be completely finished by 2030.
Getting There: Looking ahead to North Spokane Corridor …
2023年2月27日 · Construction on the North Spokane Corridor river crossing, one component of the ongoing freeway project, is expected to begin in the spring of 2023 and last through the 2025 construction season....
Opening the next section of the North Spokane Corridor: full
2023年11月21日 · In 1970, the Department of Highways (now WSDOT) released a “Corridor Study for North Spokane and North Suburban Area Freeway.” The recommended route was west of its current location, along Hamilton and Nevada streets.
Getting There: North Spokane Corridor work gets underway to …
2023年6月19日 · With the freeway’s funding and construction schedule back on track, the state Department of Transportation has broken ground on the section of the north-south corridor that will span the...
Three decades in the making: WSDOT to complete North Spokane Corridor ...
2024年10月4日 · (The Center Square) – After almost three decades of construction and more than 50 years of planning before that, Washington is gearing up to complete the $1.5 billion North Spokane Corridor project by 2030. Once complete, the 10.5-mile-long corridor will connect Interstate 90 with U.S
New section of North Spokane Corridor now open | News - kxly.com
2024年5月16日 · Now, drivers can navigate from Highway 395 all the way to Wellesley Avenue. WSDOT says the new section features 1.5 miles of the full 10.5 mile North Spokane Corridor available for drivers, with...