
STS-74 - Wikipedia
STS-74 was the fourth mission of the US/Russian Shuttle– Mir program, and the second docking of the Space Shuttle with Mir. Space Shuttle Atlantis lifted off from Kennedy Space Center launch pad 39A on 12 November 1995. The mission ended 8 days later with the …
STS-74 - NASA
1995年11月12日 · STS-74 marked the second docking of the U.S. space shuttle to Russian Space Station Mir and illustrated the international flavor of the space station effort. STS-74 crew preflight portrait includes: Astronauts Kenneth Cameron (front right) and James D. Halsell Jr. (front left), the commander and pilot, respectively for the flight.
STS-74 - 维基百科,自由的百科全书
sts-74; 运营方: 美国国家航空航天局: 国际卫星标识符: 1995-061a: 衛星目錄序號: 23714: 任務時長: 8天4小时31分钟42秒: 旅行距離
Spaceflight mission report: STS-74
2020年3月27日 · STS -74 was a Space Shuttle Atlantis mission to the Mir space station. It was the fourth mission of the US/Russian Shuttle- Mir Program, and it carried out the second docking of a space shuttle to Mir.
STS-74 - 維基百科,自由的百科全書 - zh.wikipedia.org
STS-74 是歷史上第七十二次穿梭機任務,也是 亞特蘭提斯號穿梭機 的第十五次太空飛行。
The STS-74 mission is the second of seven planned Space Shuttle-Mir link-ups between 1995 and 1997, including rendezvous and docking and crew transfers, which will pave the way toward assembly of the international Space Station beginning in November 1997.
STS-74 - NASA
2023年4月10日 · In this close-up of Space Shuttle Atlantis, the STS-74 crew is looking out the rear window. STS-74, launched on November...
STS-74 - 维基百科,自由的百科全书 - zh.wikipedia.org
2021年11月17日 · STS-74 是历史上第七十二次航天飞机任务,也是 亚特兰提斯号航天飞机 的第十五次太空飞行。
Mission STS-074 - Canadian Space Agency
1995年11月12日 · STS-74 was the second in a series of Shuttle-to-Mir Station missions. It also marked the first space flight for Canadian Space Agency astronaut Chris A. Hadfield. While aboard Shuttle Atlantis, Hadfield's most crucial task consisted of attaching the Russian Docking Module (DM) to Mir.
The STS-74 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the seventy-third flight of the Space Shuttle