Utsira High - Aker BP
The Utsira High Project develops recoverable resources of 93 million barrels of oil equivalent. Drilling will commence in third quarter 2025, while production start-up is scheduled for first quarter 2026 for Solveig and first quarter 2027 for Symra.
Utsira High - Wikipedia
Utsira High (Norwegian: Utsirahøgda) is a basement high and horst in the southwest of the Norwegian continental shelf. [1] It lies east of the Viking Graben and west of the Stord and Egersund basins 190 km west of Stavanger .
Utsira High Project, North Sea, Norway - Offshore Technology
2023年8月3日 · The Utsira High project will involve the development of two separate subsea tie-in projects in the central part of the North Sea, offshore Norway. Aker BP will develop the project along with its partners Equinor, Sval Energi, OMV and Wintershall Dea, with an estimated investment of Nkr16bn ($1.49bn).
Utsira High, Norway - NKT
The Utsira High area, located 160 km off the coast of Stavanger, gathers six offshore energy production fields on the Norwegian continental shelf. All along the development and addition of platforms, the aim has been to electrify operations.
The Utsira High Project in central part of the North Sea - NS Energy
2023年2月24日 · The Utsira High Project involves bundling three separate subsea tie-in projects in the central part of the North Sea. As part of the development, Symra (previously named Lille Prinsen) will be tied-in to the Ivar Aasen platform, while Solveig phase 2 and Troldhaugen will be connected to the Edvard Grieg platform.
Aker BP lets contract for three North Sea tie-ins
2023年1月31日 · Aker BP has let a contract to TechnipFMC for three field developments at Utsira High in the North Sea. The contract comprises engineering, procurement, construction, and installation of subsea...
Maximum utilization of power from shore to Utsira High helps
2018年6月11日 · The Utsira High area power from shore solution was originally planned for four fields – Johan Sverdrup, Edvard Grieg, Ivar Aasen and Gina Krog. With the extension of the area solution, an additional six fields – and a total of ten fields – will receive power through the Utsira High area solution: Sleipner, Gudrun, Utgard, Gungne, Sigyn ...
From metamorphic core complex to crustal scale rollover: Post ...
2022年8月5日 · It has been speculated that the Utsira High represents a metamorphic core complex exhumed in the footwall of the Utsira Shear Zone (Phillips et al., 2019). We substantiate the Utsira High as a metamorphic core complex, with a proposed structural development of the high and adjacent areas outlined in Fig. 9, Fig. 10.
More Utsira High area fields to receive power from shore
2019年10月28日 · The Utsira High area power grid, which is expected to become operational in 2022, will provide power from shore to the Johan Sverdrup, Edvard Grieg, Ivar Aasen, Gina Krog, and Sleipner fields.
Aker BP approved for Symra, Solveig Phase 2 development
2023年6月28日 · Aker BP ASA received approval from the Ministry of Petroleum and Energy (MPE) for development of Symra and Solveig Phase 2 in the Utsira High area of the North Sea. Symra field will be a tie-in...