
Rig 26 – Oil Drilling Operations in Alaska's North Slope
Rig 26 is a Technologically Advanced, Fully integrated, Multi-Modular Rig, designed specifically for Extended Reach Drilling Operations on the North Slope of Alaska. The Rig Power System is designed to use both Diesel and Natural Gas along with the ability to …
Doyon Rig 26: tapping 154 sq. mile of reservoir from a 14
2019年9月6日 · One of the largest land rigs ever built, Doyon 26—aptly nicknamed "The Beast"—is going to drill some of the longest ERD wells in the world in an extremely technically challenging Arctic environment. What an awesome experience to visit this rig firsthand and see everything up close.
Doyon 26 Rig Flyover - YouTube
This month, The Doyon 26 rig, a new extended reach drilling (ERD) rig with breakthrough capabilities, is beginning its 2,400-mile journey from Nisku, Alberta, Canada to a drilling pad on Alaska’s...
‘The Beast’ rig sets a drilling record for ConocoPhillips and cracks ...
2022年5月22日 · The Doyon 26, a massive rig that ConocoPhillips ordered six years ago to tap a long-known but especially remote oil accumulation, punched a horizontal well into the earth for a distance of 6.7 ...
Part of ‘The Beast,’ ConocoPhillips’ massive drilling rig, slides …
2020年3月20日 · The module for Doyon 26, as the rig is formally known, went off a road in the oil company’s Kuparuk field, according to a statement from Natalie Lowman, a ConocoPhillips spokeswoman.
NOV collaborates with drilling contractor to design one of the …
2020年2月10日 · Doyon 26 will soon be put to the test, as it will be used on an Alaskan Slope drilling campaign for a major operator this year. Read the full feature article in the December issue of World Oil to learn how Doyon 26 went from concept to …
How ‘The Beast’ Moved from Alberta to the North Slope
2020年7月24日 · Rig 26, Doyon Drilling’s new extended reach drilling (ERD) rig, completed its 2,400-mile journey from Nisku, Alberta to Alaska’s North Slope this past winter.
"The Beast"—Doyon 26 Rig, An Engineering Marvel - TWA
2019年4月9日 · One of the largest land rigs ever built, Doyon 26—aptly nicknamed "The Beast"—is going to drill some of the longest ERD wells in the world in an extremely technically challenging Arctic environment. What an awesome experience to visit this rig firsthand and see everything up close.
ConocoPhilips, Doyon Set to Take “The Beast” for a Test-Drive
2020年2月10日 · ConocoPhillips and Doyon Drilling Inc. are all set to take ”the Beast,” which is what they call Doyon’s Rig 26 into its testing level. It took 3.5 years to complete its construction and once tested, Rig 26 should be ready to drill by April 2020.
Oil Drilling Operations in Alaska's North Slope – Doyon Drilling, Inc.
Doyon Drilling, Inc. operates on the North Slope of Alaska with eight advanced rigs designed to drill oil wells in northern Alaska conditions.