
I-35E Phase 2 Dallas County - Texas Department of Transportation
The I-35E Phase 2 project will reconstruct and widen a 6.39-mile southern section of I-35E in Dallas County from I-635 to Denton County Line. The project will consist of widening the section from 6 to 8 lanes and improving intersections and frontage roads to decrease congestion and improve safety for motorists.
I-35E Phase II Dallas County - Texas Department of Transportation
The I-35E Phase 2 project covers the southern segment of I-35E in Dallas County from I-635 to the Denton County line and is currently being progressed through a design-build project delivery. The Phase 2 project reconstructs and widens the mainlanes from six to eight lanes.
I-35E Phase 2: Dallas County from I-635 to Denton County Line
The I-35E Phase 2 project covers the southern segment of I-35E in Dallas County from I-635 to the Denton County line and is currently being progressed through a design-build project delivery. The Phase 2 project reconstructs and widens the mainlanes from six to eight lanes.
I-35E Phase 2 - Texas Department of Transportation
TxDOT evaluated the design, construction, operation and maintenance of a project to reconstruct and widen I-35E from I-635 to the Denton County line in Dallas County (I-35E Phase 2 Project). Visit the project page and Keep It Moving Dallas for more information on the project.
I-35E (Ph 2) in Dallas County will consist of the full reconstruction and wid-ening of I-35E from I-635 to the Denton County Line, approximately 6.39 miles. The general purpose lanes (GPLs) will be widened from 6 to 8 lanes and the existing Toll Managed Lanes (MLs) will …
Authorize TxDOT to issue a request for proposals (RFP) to design, construct and maintain the I-35E Phase 2 Project.
I-35E Phase 2 construction - dfwfreeways.com
2024年5月24日 · In July 2021 a $655 million contract was awarded to Lone Star Constructors, a join venture of Fluor and Austin Bridge and Road, for the second (and final) phase of the IH-35E expansion between IH-635 and the Bush Turnpike. The freeway will be widened to 8 main lanes (four each way) and at least two managed lanes.
Limits: I-35E from US 77 S of Waxahachie to US 77 N of Waxahachie CSJ: 0048-04-090 – Ellis County Description: Reconstruct 5 Interchanges (Business US 287, US 287 Bypass, Lofland Road, Butcher Road (FM 387) and Sterret Road.), frontage roads and ramp modifications. Length: 11 miles PS&E Consultant: TBD ESTIMATED COST Estimated Cost (unfunded ...
I-35E Phase 2 Project July 29, 2021. Overview Texas Clear Lanes (No Prop 1 or Prop 7) Total length: 6.39 miles Project scope: – Reconstruct and widen general purpose lanes from 6 to 8 lanes – Reconstruct two “grandfathered” existing reversible tolled managed lanes (no increase in capacity) – Reconstruct the continuous frontage
IH 35E from IH 635 to US 380 - Keep It Moving Dallas
The I-35E project is dedicated to improving mobility along I-35E in a safe, efficient, reliable and environmentally sensitive manner. Scope The ultimate $4.8 billion project would rebuild the entire 28-mile corridor will require two phases and will provide the travelling public managed lanes with dynamic pricing on managed lanes to keep traffic ...