
EMD SD20 - Wikipedia
The SD20 is the product of a rebuilding program by the Illinois Central Gulf's Paducah Shops as a conversion from the EMD SD7, EMD SD24, SD24B (cabless), and EMD SD35 locomotives. The program involved rebuilding the 567 engine to 645E with 2000 horsepower rating, eliminating the turbocharger if equipped with one, upgrading the electronics to ...
Pictures of ICG 2041 - mtweedel13.rrpicturearchives.net
Illinois Central Gulf SD20 #2041 was orginally built in September 1965 as Baltimore & Ohio SD35 #6437. Unit later became Illinois Central #2041 before leaving roster and becoming NREX #2041 Photo Date:
Pictures of ICG 2014
ICG SD20 2004, Chicago, Illinois, August 12, 1982, photo by Chuck Zeiler. It appears the ICG changed their mind(s) about the color of the cab number. Number 2004 was built in August 1959 as UP SD24B 416B (c/n 25404) on EMD Order 5602.
Pictures of ICG 2020
The rear truck of Illinois Central Gulf SD20 2020 was receiving some attention on the west side of the railroad's McComb Locomotive Shop, built in 1888. On the other side of the rear of the unit is one of the rails for the travelling gantry crane, which was used for most locomotive lifting work.
EMD SD20 - Trains and Railroads
The SD20 is the product of a rebuilding program by the Illinois Central Gulf's Paducah Shops as a conversion from the EMD SD7, EMD SD24, SD24B (cabless), and EMD SD35 locomotives. The program involved rebuilding the 567 engine to 645E with 2000 horsepower rating, eliminating the turbocharger if equipped with one, upgrading the electronics to ...
Pictures of ICG 2003 - m.rrpicturearchives.net
ICG SD20 2003 westbound at Glendale Heights, Illinois in March, 1980, photo by Chuck Zeiler. Photo location has been corrected, thanks to Jeff Carlson's comment below. This locomotive was built in August 1959 as UP SD24B 418B (c/n 25406) on EMD Order 5602.
SD20 - Flickr
The SD20 locomotive is the purpose of this group. ICG's Paducah Shops began a rebuild program in 1979 for the 2000HP, six axle units. As a part of the rebuild program, they were completely rebuilt, installed a centralized air filtration system, and the electrical systems upgraded to "-2" standards along with a new cab.