
Forwards insp rept 70-0008/98-02 on 981116-18 & 1211.No …
2024年10月28日 · Forwards insp rept 70-0008/98-02 on 981116-18 & 1211.No violation noted.Purpose of insp was to determine adequacy of confirmantory survey conducted by ORISE in building 2. Accession Number: ML20198D504. Date Released: Monday, October 28, 2024. Package Contents. The following links on this page are to …
10CFR50.59 EVALUATION SUMMARY REPORT 0008 COMMITMENT MATERIAL CHANGE EVALUATION REPORT 0003 ' Gentlemen: Please find attached the following periodic reports pertaining to CPSES Units 1 and 2. (A) Attachment 1 is the report required by 10CFR50.59(b)(2) for activities since: August 1,1997, at CPSES Units 1 and 2.'
瑞浦兰钧能源股份有限公司丨动力电池与储能电池创新解决方案
探索瑞浦兰钧的动力电池和储能电池,提供高效、安全、可持续的能源解决方案,助力绿色未来。
TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008…
Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630; ML20210J908: Person / Time; Site: Comanche Peak Issue date: 08/02/1999: From: Terry C, Walker R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) To: NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) Shared ...
MIRS2302-REPT-0008-エレクトロニクス不具合報告書
版数 最終更新日 作成 承認 改訂記事; a1: 2024.02.20: 早川蔵之介,和田莉央: 初版
examination of procedures and representative records, observations, independent measurements, and interviews with personnel. The inspection also. adequate to protect the radiological safety of employees and the public. violation of NRC requirements, as specified in Enclosure 1.
NRC: Package ML20210J913 -Forwards "CPSES 10CFR50.59 …
Forwards "CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201" & "CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630." Accession Number: ML20210J913. Date Released: Tuesday, August 11, 2020. Package Contents. The following links on this page are to Adobe Portable Document Format (PDF) files.
Contrary to regulations stipulated in 10 CFR Part 20.101(a) an employee received approximately 31 rems to the rignt hand on July 20, 1980. This overexposure was formally reported to Region III on August 19,1980, in accordance with reporting requirements in 10 CFR Part 20.405.
Based on the results of this inspection, the NRC has determined that no violations of NRC requirements occurred. The radiological surveys conducted in Building 2, except for two small pieces of uranium metal identified in a first floor trench in Room 2074, did not identify any radioactive mater;als in excess of NRC release guidelines.
Report Details 1.0 Background in 1943, Battelle Memorial Institute (BMI) performed atomic energy research and development while under contract with the Manhattan Engineer District.