
Wastewater Capacity Reservation Letter - Water - Houston …
A WCR Letter will: Determine if there are adequate and available wastewater and water utilities to serve the proposed development; Identify the point of connection to the City's wastewater and water utilities; Determine if impact fees are due
Impact Fee Administration - Houston Permitting Center
The Impact Fee Administration, a section of Infrastructure & Development Services, manages wastewater flows through Wastewater Capacity Reservations (WCR), manages water demands through water commitment letters, and plans the near and long term facilities requirements to assure reliable service for today and the future.
Two weeks may be required to process the WCR application. The wastewater/water letter(s) and the storm drainage letter will be mailed separately. The storm letter is processed and mailed by the Office of the City Engineer. Please contact Gholam A. Namaki at 832-394-9107 for questions concerning the storm letter.
When submitted as a food service establishment project, the drawings will need BSG and COH Health review and approval, BSG will permit and inspect the installation and COH Health will conduct the pre-opening inspection of the food service establishment.
City of Houston > Online Permits
1) PER WCR LETTER, VALIDATION MUST BE COMPLETED WITHIN (6) MONTHS FROM THE: DATE OF THIS LETTER AND PRIOR TO ISSUANCE OF A BUILDING PERMIT BY EMAILING: THE WCR LETTER AND THE COMPLETED VALIDATION FORM TO [email protected] * Please note, signing the validation form and directly uploading that into: ProjectDox is not validating the letter.
Wastewater Capacity Reservation Letter - Houston Permitting …
A WCR Letter will: Determine if there are adequate and available wastewater and water utilities to serve the proposed development; Identify the point of connection to the City's wastewater and water utilities; Determine if impact fees are due
Houston Water Planning | City of Houston - Houston Public Works
The Planning Branch supports Houston Water by advising on delivery of water and wastewater services today, and planning for delivery of those services in the future.
Wastewater Capacity Reservation Name Transfer - Houston …
Wastewater Capacity Reservation Name Transfer. Once transferred valid until wastewater capacity is used. If impact fees were paid but development never occurred, the capacity may be transferred from one property owner to the new owner of …
TX Wastewater Capacity Reservation Transfer Application - City Of ...
A WCR Letter will: Determine if there are adequate and available wastewater and water utilities to serve the proposed development. Identify the point of connection to the City's wastewater and water utilities. Determine if impact fees are due.
WASTEWATER CAPACITY RESERVATION APPLICATION
The attached WASTEWATER CAPACITY RESERVATION APPLICATION (also used to obtain water and storm letters) must be completed by the current property owner or by an authorized representative of the owner. Fee simple owner signatures must be ORIGINAL and in BLUE INK.
- 某些结果已被删除